- Project Name: Consultancy Services for Rehabilitation of Drainage Facility and ETP cum STP
- Scope: Provision of consultancy services for the rehabilitation of existing drainage facility and construction of an Effluent Treatment Plant (ETP) cum Sewage Treatment Plant (STP) with an assumed capacity of 10 m3/h.
Key Points:
- Client Requirement: The project entails the rehabilitation of the existing drainage facility and the construction of an integrated Effluent Treatment Plant (ETP) cum Sewage Treatment Plant (STP) to address wastewater management needs.
- Objective: To upgrade the drainage system and establish a treatment facility capable of handling industrial effluent and sewage in compliance with environmental regulations.
- Project Scale: The assumed capacity of the ETP cum STP is 10 cubic meters per hour.
Project Deliverables:
- Site Assessment: Conducting a comprehensive assessment of the existing drainage facility and treatment requirements.
- Design and Engineering: Development of detailed designs and engineering plans for the rehabilitation of the drainage system and construction of the ETP cum STP.
- Construction Oversight: Providing technical supervision and quality assurance during the construction phase to ensure compliance with design specifications and standards.
Outcome:
- Improved Wastewater Management: Rehabilitation of the drainage facility and establishment of an integrated ETP cum STP to enhance wastewater treatment capacity and efficiency.
- Environmental Compliance: Ensuring compliance with environmental regulations and mitigating the environmental impact of wastewater discharge.
Conclusion:
- The Consultancy Services for Rehabilitation of Drainage Facility and ETP cum STP project underscores INSIDE ENGINEERING’s commitment to providing comprehensive solutions for wastewater management and environmental sustainability.
Next Steps:
- Implementation of the rehabilitation and construction works based on the detailed designs and plans provided by INSIDE ENGINEERING, followed by commissioning and operationalization of the upgraded facility.