• Project Name: Consultancy Services for Effluent Treatment Plant (ETP)
  • Client: Graphics Textiles Limited
  • Location: Dhamrai, Bangladesh
  • Scope: Provision of consultancy services for the design and implementation of an Effluent Treatment Plant (ETP) with a capacity of 100 m3/h.

Key Points:

  • Client Requirement: Graphics Textiles Limited requires consultancy services for the establishment of an Effluent Treatment Plant (ETP) at their facility in Dhamrai, Bangladesh.
  • Project Scale: The ETP will have a capacity of treating 100 cubic meters of effluent per hour.
  • Objective: To design and implement an efficient ETP to treat industrial effluent and ensure compliance with environmental regulations.

Project Deliverables:

  • ETP Design: Development of detailed engineering designs for the Effluent Treatment Plant, tailored to the client’s requirements and regulatory standards.
  • Implementation Support: Provision of technical guidance and support during the construction and installation of the ETP.
  • Commissioning Assistance: Assistance in the commissioning and operationalization of the ETP, including testing and optimization of treatment processes.

Outcome:

  • Efficient Effluent Treatment: Successful establishment of an ETP with a capacity of 100 m3/h, capable of treating industrial effluent to meet environmental discharge standards.
  • Environmental Compliance: Ensuring compliance with regulatory requirements and mitigating the environmental impact of industrial wastewater discharge.

Conclusion:

  • The Consultancy Services for Effluent Treatment Plant (ETP) project demonstrates INSIDE ENGINEERING’s expertise in providing comprehensive consultancy services for environmental management and compliance.

Next Steps:

  • Handover of detailed engineering designs and commissioning support to Graphics Textiles Limited for the construction and operationalization of the Effluent Treatment Plant in Dhamrai, Bangladesh.